About cats on Henderson Field…… (1 Viewer)

Ad: This forum contains affiliate links to products on Amazon and eBay. More information in Terms and rules

Skywalker Jin

Airman 1st Class
194
175
Oct 23, 2025
It seems that those wildcats on the Henderson Field used mud as runways for I hadn't found any pictures about "F4F on Marston Mat".
However I still want to place my cat on the Mat because there are ready-made kits for it.
Pictures about "F4F on Marston Mat during 1942.10~1943.7" are needed.
Thank you.
 
Here ... cicrca 1942 ...

dispersal-area-of-henderson-field-guadalcanal-circa-1942-usmc-archives-soule-collection.jpg

the pic source: Dispersal Area of Henderson Field, Guadalcanal, circa 1942 USMC Archives Soule Collection
 
Last edited:
The "web-like thing" is either Sommerfeld mat, or Army Track Matting, which was basically steel mesh, rolled out and pegged with lengths of steel strip or cable as reinforcement along the overlap of the rolls.
For modelling this in 1/48th scale, I use nylon mesh as used in dress making etc, as shown below.



Mesh 1.jpg
Mesh 2.jpg
 
The "web-like thing" is either Sommerfeld mat, or Army Track Matting, which was basically steel mesh, rolled out and pegged with lengths of steel strip or cable as reinforcement along the overlap of the rolls.
For modelling this in 1/48th scale, I use nylon mesh as used in dress making etc, as shown below.



View attachment 868575View attachment 868576
Another useful tip, thanks Airframes
 
"We only have one revetment. What should we put in there?"

TBF suddenly appears.

Lightnings gaze wistfully, their hopes and dreams crushed.
Nice words, what are they describing?
 
It seems that those wildcats on the Henderson Field used mud as runways for I hadn't found any pictures about "F4F on Marston Mat".
However I still want to place my cat on the Mat because there are ready-made kits for it.
Pictures about "F4F on Marston Mat during 1942.10~1943.7" are needed.
Thank you.
More commonly known as PSP (Pierced Steel Planking). Still used in the present day. When I was at RAF Stanley it was used extensively, including for the Harrier Tie-down facility. While pushing a Harrier back onto the Tie-down pad, one of the mainwheels ran over one of the lugs which had been bent up, which is not uncommon with PSP apparently.
 
There were quite a number of forms of track surfacing for airfields used in WW2 beyond those mentioned above. In summary:-

Light weight wire types:-
Sommerfield Track - British development. Came in rolls 10ft 7in wide & 75ft long. Hexagonal pattern mesh with transverse reinforcement bars every 8in.
Square Mesh Track (SMT) - British development from steel used in concrete reinforcement. 3in square mesh. Came in form of panels 12ft x 6ft or rolls 7ft 3in wide by 77ft long. Extensively used in Normandy for the early strips and laid over grass to reduce wear. Needed to be well pinned down or it formed waves as aircraft moved over it!

Panel types:-
Channel Track
- Developed in Britain. Consisted of panels 11ft x 6ft
Bar & Rod - US development. Not used on a large scale. Panels were 12ft x 3ft
Irving Grid Track - US development from before their entry into WW2 and produced on a limited scale. Panel size 12ft 6in x 1ft 10in.

Plank type:-
Pierced Steel Plank (PSP) or Marston Mat - most widely used of all types. Panels or planks were 1.25ft x 10ft formed from mild steel. One problem was that water tended to gather under the surface and as traffic moved over it, turned to a muddy slurry that weakened the surface layer. Often solved, in Europe at least, by laying it on a bed of straw.

And finally Prefabricated Bituminous Surfacing (PBS). This was a bituminised jute hessian cloth manufactured in Britain and used by both British and American engineers to provide a waterproof surface. First trialled in June 1943. It came in rolls about 3ft wide and 80 yard lengths rolled onto steel / timber formers. Unlike the steel options above it added no strength to the ground serving only to stabilise the bearing capacity of the underlying ground that had already been graded and smoothed. Eash strip was laid lomgitudinally and overlying the previous one by half its width to give a double layer across the airstrip. It was successful if laid in dry weather. It held several advantages. It was quick to lay once the ground was prepared, could last for up to a year and weighed considerably less than PSP to transport (812 tons v 4,877 tons of PSP) for an average airfield.

Between D-Day and 30 Oct 1944, 30 airfields in NWE (17% of the total constructed) were surfaced with this. After that it stopped being used with the arrival of the wet autumn / winter weather. It was also extensively used in India / Burma.
 
There were quite a number of forms of track surfacing for airfields used in WW2 beyond those mentioned above. In summary:-

Light weight wire types:-
Sommerfield Track - British development. Came in rolls 10ft 7in wide & 75ft long. Hexagonal pattern mesh with transverse reinforcement bars every 8in.
Square Mesh Track (SMT) - British development from steel used in concrete reinforcement. 3in square mesh. Came in form of panels 12ft x 6ft or rolls 7ft 3in wide by 77ft long. Extensively used in Normandy for the early strips and laid over grass to reduce wear. Needed to be well pinned down or it formed waves as aircraft moved over it!

Panel types:-
Channel Track
- Developed in Britain. Consisted of panels 11ft x 6ft
Bar & Rod - US development. Not used on a large scale. Panels were 12ft x 3ft
Irving Grid Track - US development from before their entry into WW2 and produced on a limited scale. Panel size 12ft 6in x 1ft 10in.

Plank type:-
Pierced Steel Plank (PSP) or Marston Mat - most widely used of all types. Panels or planks were 1.25ft x 10ft formed from mild steel. One problem was that water tended to gather under the surface and as traffic moved over it, turned to a muddy slurry that weakened the surface layer. Often solved, in Europe at least, by laying it on a bed of straw.

And finally Prefabricated Bituminous Surfacing (PBS). This was a bituminised jute hessian cloth manufactured in Britain and used by both British and American engineers to provide a waterproof surface. First trialled in June 1943. It came in rolls about 3ft wide and 80 yard lengths rolled onto steel / timber formers. Unlike the steel options above it added no strength to the ground serving only to stabilise the bearing capacity of the underlying ground that had already been graded and smoothed. Eash strip was laid lomgitudinally and overlying the previous one by half its width to give a double layer across the airstrip. It was successful if laid in dry weather. It held several advantages. It was quick to lay once the ground was prepared, could last for up to a year and weighed considerably less than PSP to transport (812 tons v 4,877 tons of PSP) for an average airfield.

Between D-Day and 30 Oct 1944, 30 airfields in NWE (17% of the total constructed) were surfaced with this. After that it stopped being used with the arrival of the wet autumn / winter weather. It was also extensively used in India / Burma.
Thanks for adding additional info!
 
The TBF appears to be being bombed up, (torpedoed?) from the looks of the ordnance beneath the wings. The revetment would be the place for such activity.
 