Interesting, but there might have been more mileage out of building Mustang Is fitted with 60 Series Merlins from the outset instead of Allisons, rather than converting Spits for the long range role. Obviously, the airframes would have to be shipped to Britain for the fitting of Merlins. The first 60 Series Merlin engined Spitfire first flew three weeks after the Fw 190 entered service, so time wise it could be done, hypothetically speaking. Rolls-Royce fitted Merlin 65s to five Allison engined Mustang Is and these were called the Mustang X, first flying in October 1942 and demonstrating excellent performance. One aircraft reached 433 mph during testing.
Even fitting Mustangs with Merlin XX series would have made a difference though it would have struggled at bit at the high escort altitudes (but been very useful for other purposes though).
Trouble was the the 60 series Merlins were not available when the P-51A first came out.
And it took a bit of time for people to twig to the idea. At that time neither the British or the American saw the P-51 as a fighter, let alone a VLR escort fighter.
So it really was inspired by the small amount of British and North American people who saw its terrific potential and pushed for it (including Rolls Royce, hat tip to them, without their belief in it, it would never have happened).
Note the P51A was a great low level aircraft and the British used it for tac rec right up until they had none left in late '44, a greatly underestimated plane.
The USAAF desperately needed escorts, at least as far as the Ruhr and a bit beyond. A LR Spit, many of which could have been conversions, would have been of inestimable value in the mid-late 43 period.
Took a long time build up Mustang numbers too, even in early 44 they didn't have many. And Packard was struggling to get its 60 series production up to speed (they did a great job, especially since you consider that they were basically just a luxury car manufacturer before the war, got to take your hats off to them).
I think it was (from memory) suggested at one point to use RR Merlins as a stop gap, but the USAAF knocked that on the head, mainly because of maintenance concerns (if anyone can clarify that it would be useful).
So, as usual, it was a numbers game and the LR Spit would have been a great stopgap and support for that crucial 9 month period.
It would have also given the RAF a lot more tactical options too, they would finally have been able to hammer the Luftwaffe in France for example and even enable Bomber Command to do daylight raids for certain types of missions.
The tragic thing was that it was available in the necessary time period, just was ignored. People kept saying you can't make a LR fighter and various people kept putting their hands up going "we've done it with the Spit and we've got an even better one (Mustang) coming along a little bit later' ... and no one lat the top listened. Bizarre.