The timeline might be something like this: after fall of Poland, it is too obvious that Germany will turn West. The RAF has a number of Hurricanes, but the mass production of Spitfires is not up to the pace yet. So despite having the better design to follow, the Hurricane will need all updates it can receive, in order to stay competitive in future.
The updates should not hamper the mass production too badly, maybe best if introduced gradually through time. The modifications/updates can use stuff historically produced only - no Hispano Vs in 1941, no two-stage Merlins for BoB. The overweight parts should be avoided
A part of the thread can be devoted for a plausible production in Canada, maybe even Australia. If you want to upgrade it to the VJ day, feel free to do so.
The updates should not hamper the mass production too badly, maybe best if introduced gradually through time. The modifications/updates can use stuff historically produced only - no Hispano Vs in 1941, no two-stage Merlins for BoB. The overweight parts should be avoided
A part of the thread can be devoted for a plausible production in Canada, maybe even Australia. If you want to upgrade it to the VJ day, feel free to do so.