Defiant also need to meet the swift end, and have BP make something useful. In the spirit of this thread, they can star making Hurricanes before ww2 starts.
Wait!!! That means BP won't be able to build Roc's under subcontract! Without Roc's the Empire is facing imminent doom
Maybe Blackburn and or BP could have tried making a folding wing Hurricane?
Then we indeed have the Henley to be cancelled both because of the time and development it sucked up, as well as due to the usage of Merlin engines and excellent propellers
I am not sure about the propeller, source vary but some say two pitch. This may have been part of the problem as a dive bomber.
Before 1940, dead wood wrt. the useless development were Hotspur, plus the two Gloster fighters (keeping the things in family for the moment). The development resources and time can be spent in making the Hurricane better, including extending the range.
Basically the problem with a long range Hurricane is that the thing is flying barn door. It's huge wing offered the ability to lift a large load out of a small runway (once they got CS props) but it's large size and thickness was always going to be high drag (unless you are talking about changing the wing) and the Spitfire is always going to offer more miles per gallon of fuel which means a lighter fuel load and/or higher speed on the way back.
Again things change. A IIA can climb to 20,000ft about 1.2 minutes faster than a MK I with a Rotal prop. It also has ceiling about 2,000ft higher and about 16-18mph faster, which means that it will be able to fight in the above 20,000ft area a lot better, it will also be able to fight at the lower altitudes a bit better in low gear of the supercharger.
Hopefully, people in the charge will be having these Hurricanes escorting something, not just idly sending them with no purpose. Leaving to the Axis commanders with a decision to make: should we attack the bombers, or the escorting Hurricanes?
Not every Axis fighter was a Bf 109F or a MC.202.
True but some people seem to forget about the MC. 200 and the G. 50
The Italians were not depending only on CR 32s and CR 42s.
The MC 200 as almost as as fast as non Trop Hurricane I and could certainly out climb it, at least until the altitude got on the high teens or low 20s.
The MK I Trop was just about the same speed (adjust for height) and couldn't climb for crap.
On the other hand the MC 200 had crap for range
The G.50 was slightly slower but it was still a dangerous opponent for a Hurricane I Trop.
But NA was different than the BoB. In the BoB both sides were fighting for altitude in most engagements. In NA any bombers (ground attack aircraft) had to fly low in order to spot the targets as there were only a few cities and one railroad and very little paved road to act as markers.
Engagements tended to be much lower than typical BoB engagements although there were exceptions in both theaters
The problem with long campaigns is you don't have to shoot the enemy coming in, that is sort of bonus. If you can shoot down enough of them when they are on the way out they start running out of planes to send on later missions. In NA there were no factories that could affect supply later, there were only existing forces on the ground (and air) and supply dumps. This hurt to loose but it was more replaceable than loosing a factory in the home country.