Yes, the availability of the Merlin 60 series in quantity required was one of the limiting factors in the transition from the Spitfire V to the Spitfire VIII and Spitfire IX. Consider that later build Spitfire XVI, which was essentially a Spitfire IX but powered by a US built Packard Merlin didn't go into production until late 1944 when sufficient quantities of the Packard Merlins were available to meet both Mustang and Spitfire production requirements. Sholto-Douglas in his correspondence in 1943 and within the Air Staff meeting minutes and MAP production minutes, were all looking at the balance between keeping what they had flying and introducing the later and better variants into service. Sholto-Douglas in particular was very concerned about the diversion of 60 series Merlin Spitfire variants overseas, which meant he had to keep what he considered a disproportionate number of Squadrons still equipped with the Spitfire V. When you look at the number of Squadrons in the UK still equipped with the Spitfire V by D-Day, it says something about the planning and manufacturing of all types required by the RAF at home and overseas. In particular, the percentage of resources split between Fighter Command and Bomber Command was a continual source of tension.Given that CBAF continued to churn out Mk.V Spitfires until mid-1943, it would suggest that there were not enough Merlin 60 series engines to allow a full changeover of production to the Mk.IX. So where are the additional Merlin 60 series going to come from for your plan? As it was the earliest Mk.IX were conversions of Mk.Vc airframe by Supermarine and by Rolls Royce Hucknall in late summer 1942.