Actually happens often in oil field engineering. All specifications are written in cooperation with manufacturers, otherwise you specify what cannot be done, then you issue a new spec for what can be done, if you catch my drift.This is interesting about the Specifications possibly being adjusted to fit the prototype. Seems backwards