Although 118 XXI's were built between 43-45, they had big quality control problems. Only 4 were ever brought up to combat ready status. Only 2 went on war patrols, and sank NOTHING.
One thing that is not a myth, they sunk NOTHING.
Just like most of the wunderweapons, CSWBD.
The XXI's were manufactored as subassemblies remote from the shipyards, usually construction on a conventionally assembled ship is when it is started at the shipyard itself,or laid down. The XXi's weren't considered laid down till the subassemblies reached the shipyard. Though construction of the subassemblies would have started earlier, of course.
The U-2511 subassemblies were started in Nov. 43, laid down at the shipyard Jul. 44.
The sad fact is the only thing they accomplished is to advance the Navys of other countries, they advanced the Nazi regime not one inch, not one second. All those tons of steel, and thousands of man-hours for not one allied ship sunk. That in anybodies estimation but yours is a abject failure.
My agenda? What is your agenda? In my posts i've never got personal, can you say the same?
When a country puts millions of man-hours and steel into a weapon, it's expected to do some sevice for that country, if it doesn't then that weapon system is a failure, a waste of resources that could have been more productively used elsewhere.
I'm ROFL, because you can't see that this program and several others like it hastened the end of the war, sure it's a wunderweapon, but I wonder what Germany could have done with the same resources, more intelligently applied.