According to Curtiss documents the 12 Siam order 75N were delivered in the US November 1938 to January 1939. This was during the main P-36A run (September 1938 to March 1939), alongside the 30 75O for Argentina (Nov/Dec 38) and the start of the 75A-1 order for France in December 1939.