Mosquito DZ594 was a converted B.IV with the bulged bomb bay. It was used for trials of the alternate bomb installations of 1 x 4000lb HC/MC/GP bomb or 4 x 500lb MC/GP bombs.
The 4000lb bomb was carried on a EM Release Unit Type F, which was permanently fitted to the bomb bay. Two 2000lb winches were provided for hoisting the bomb. During trials the forward winch slipped when the bomb was almost in position, while the rear winch slipped continuously. Inspections of the units by de Havillands and the winch manufacturer, Stones, came to the conclusion that they were faulty. Once replaced no further issues were experienced.
The crutches worked well for the 4000lb HC bomb, but the crutch pads were at the extent of their travel and only touching on their edge when used with the 4000lb MC and GP bombs. It was recommended that the crutch pads have a universal joint, extra travel and a more useable nut.
The rear fuzing box was incorrectly placed for the MC and GP bombs, being behind the tail drum. This needed to be moved forward of the tail drum.
Flight trials included speeds up to 320mph and evasive manoeuvres. The HC bomb was found to be satisfactory, but the front crutch pads worked loose when trialed with the MC bomb. Recommendations were to add a double lock nut to prevent this happening in the future.
Both HC and MC bombs were dropped satisfactorily from the Mosquito at 290mph IAS.
Tests were done with two experienced sets of armourers to see how long it would take to convert to use the 4 x 500lb option. The times for conversion were 1h50min and 3h, which was considered unsatisfactory.
It was found that the castings for the bomb supports (cross members, I suspect) were not interchangeable and were as much as 1/2" out of alignment. It also required considerable force to install the lock pins.
The crutches for the 4000lb bomb installation had to be put into their stowage position when using the 4 x 500lb option.
The 4 x 500lb installation was, otherwise, the same as the B.IX above.
Flight trials were satisfactory with this installation, the bombs being dropped at 250mph - slow speed due to extremely turbulent conditions.
Hoisting times for 4 armourers were:
4000lb MC - 9 minutes
4000lb GP - 11 minutes
4000lb HC - 6 minutes
4 x 500lb - 35 minutes
Bomb clearences were
| Dive | Climb | Roll |
| 4000lb MC | 29° | 27° | 12° |
| 4000lb GP | 30° | 36° | 17° |
| 4000lb HC | 25° | 26° | 14° |
| 4 x 500lb | 33° | 33° | 15° |
It was noted that the tail of the 4000lb GP bomb bears on the bomb bay roof, the doors only just close on the 4000lb HC and much care is required when engaging the suspension lug of the MC bomb with the release unit.