yah B4, but W.Nr.110 064 was converted to a G-5/AS retained GM-1 w/ C4.
operation with GM-1 AS engines..
First Operation
The special fabric is in a thermally insulated container of about 115 l
Content and means of compressed air at a pressure of 4-5 atm in the nozzle
Charger shaft of the engine down. Here, the material reaches the intake air
stream is atomized and vaporized, and so with the charge air to the motor-
leads.
By turning on the switch self-GM 1 (A10) in the cab the promotion
derpreßluft to the GM 1-tank given, the system is serviceable.
By pushing of button 1 (white ring) 2 valves are opened.
This one makes way for the GM 1-fluid to the motor, the other sets
by opening a large cross-section of the initial period of conditioning to
full effect (only lines must be cold) down to about 6 sec.
By releasing the push button 1 to 6 seconds, this quick release Sven-
valve is closed again. The plant is in operation. Pressing Pressure
2 button (red dot) is switched off the system.
The GM-1 system can be any number of times during the flight and switched on
be. If the equipment during the flight once been in operation, he-
übrigt on further turning on a long press on button 1, because the
System now responds immediately.
The GM-1 according to the container may also Einsatzweck filled with 80 l
be. This is a second vent pipe in the container provided. In the
Delivered, the 80 l capacity is set. Is filled with 115 l
To remove the blank disc in conjunction tee two vent pipes.
Second After filling the tank with GM-1 and compressed air.
The compressed air pressure must be at least 135 atm, 150 atm, however, may not
. exceed The hand is bleeding in the Preßluftniederdruckleitung
. close
By switching on the network and impressions of the GM-1-self-switch (A10)
is compressed to a container filled with GM to review the
Betanksatzes given tightness. GM made a self-switch, power off, hand-
vent on. The aircraft can be parked until the start.
Third Action immediately before the start.
Close hand vent. The pilot pushes before the start of the A 10
"On", the system is so serviceable.
4th Start.
Attention from the Start! Aircraft nose up through the GM-1 system and
Therefore, to trim to 1 1 / 2 top-heavy.
5.Einsatz GM first
GM 1-addition may be made until full pressure over high, otherwise the engine over-
overloaded and is still no better flight performance can be achieved.
Minimum altitude at Flgz. with DB 605 A engine climb 8000 m.
Minimum altitude at Flgz. with DB 605 AS engine climb 10000 m
Minimum altitude at Flgz. with DB 605 AS engine level flight 10,500 m
At GM, an operation may be flown only with air screw mechanism. GM 1
principle is added only in combat power. However, the throttle
flap can be actuated during the GM 1-flight, without further notice (b. approaches, etc.).
Addition of GM 1: Press button 1 (white ring) about 6 sec then
Releasing the push button.
Power off by pressing of button 2 (red dot).
- 2 -
6th Coolant temperatures: (Only valid if coolant pressure relief valve
MDV-16 D, No. 8-4643 D equipment installed).
Aircraft with GM 1 may be at any altitude with an engine outlet
be flown temperature of 100 ° C. Controls the automatic radiator valves
at low temperatures (about 80 - 90 ° C), then by manual adjustment of
Fold the cooler temperature to 100 ° C., and thus essential
considerable improvement of flight performance are achieved (not over-engine ATTENTION!
. overheat)
7th Oxygen system.
When using air charger for charging the pressurized cabin of the aircraft
tool (as opposed to air compressors) is one of the GM-operation during the
Cabin air for breathing unusable. It is therefore essential
that the altitude breathing switched to manual intervention by blowing oxygen
is. The oxygen supply in these machines is increased accordingly.
8th After landing.
GM 1-auto switch (A10) turn off, open hand vent valve immediately!
9th Evaporation GM 1 with a filled container and open hand ventilation.
By absorption of heat occurs continuously evaporation of a substance. It
is obvious that this loss on at higher ambient temperatures largest
is. On hot summer days is to be expected that the GM 1 content in the
Bf 109 is evaporated in 2 days. As a rough guide of the training
steam may serve the following values:
Duration of the GM-1 Flight Time: (Figures in brackets for filling 80 l)
.
First Start immediately after filling the system.
Summer: 22 min (17) Winter: 22 min (17)
Second 6 hours after filling
Summer: 19 min (15) Winter: 21 min (16)
Third 12 hours after filling
Summer: 16 minutes (12) Winter: 19 min (15)
4th 24 hours after filling
Summer: 11 min (9) Winter: 16 minutes (12)
Since the container with an open hand ventilation is not under pressure, is a
Refueling at any time.
10th Fuel consumption.
The higher power output with GM 1-operation requires a higher power
fuel consumption. In the currently GM added 1-set, an Ordinary-
Licher consumption of 40 l / h can be assumed.
11th Full inspection and test plan for GM plants in a Bf 109 G can
with the Department 19583/Lg.P.A L. Brussels will be requested.
(Obing. Tritzna).
12th Trained GM 1-waiting for the troops are already available and
gene are over. TT IV (Stabing. Schotmann, Rfn. 6970) to request.
so you are relying on a man thats 90 . I use 90 because thats the age of my dad and if I ever want to know about Finches Cornells Stearmans or Hurricanes I'll ask him but my old boy which is amazing is still on top of his game unlike most of the old guys. I've talked to aces , experten and the such and most know of which they talk but memories are are a little frayed and my memories are a little frayed and I'm only 60.
86 years young. His mind is still as sharp as a razor. He says you never forget the thing that saves your life. Or the experiances of as he puts it " that senseless war ".