RAF tests, The ranges of fighters are shown as ranges at maximum economic cruising power on the fuel available, after deducting fuel used in 15 minutes at maximum power at sea level. This allowance is for warming up and climbing to operational height.
Martlet I 107 gallons for cruise, 29 gallons for allowance, total on board 136 gallons, cruising at 15,000 feet at 257 mph range 690 miles, 2.7 hours endurance, at 165-175 mph range 845 miles endurance 5 hours.
Hurricane I 77.6 gallons for cruise, 19.4 gallons for allowance, total on board 97 gallons, cruising at 15,000 feet at 275 mph range 455 miles (DH) or 445 miles (Rotol propeller) endurance 1.65 hours, at 170 to 180 mph range 600 miles, endurance 3.4 hours.
The F4F-3 had 120 imperial gallons on board, the F4F-3 engine was more powerful which would increase the allowance. It was also was around 500 pounds heavier. Or to put it another way fuel allowance for Spitfires in pounds, mark I 146, mark II 191, mark V 216.
In May 2022 I emailed the editor at hyperscale.com about differences between what I have and the information at
The Grumman Wildcat in FAA Service by Bruce Archer
no reply. The author Bruce Archer did participate in some discussions about the differences a while ago now but the web page has not changed.
Pulling everything together, notes from RAF contract cards and USN record of acceptances. There are some disagreements with the web site's Wildcat article.
Martlet I ex French order F-292, requisition 2/E1/40 for 95 mark I (14 mark III serials reported as mark I, AX725 to 38) Wright GR-1820-G205A-2, the 81 Martlet I serials were AL236-AL262 (At RNAS Donibristle November and December 1940), AX824-AX829 (at Scottish Aviation August 1940), BJ507-BJ527 (At Scottish Aviation September 1940 on) and BJ554-BJ570 while BT447-BT456 were allocated to the 10 lost at sea. AL231 to 235 cancelled, replaced by AX824 to 829, so 5 cancelled, 6 replacements.
Martlet II/F4F-3/G-36B, order A-1548, requisition 2/E1/40, P&W R-1830-S3C4G. AM954 to AM999 and AJ100 to AJ153, with the first 10 built AM954 to AM963 having fixed wings and later considered mark III, total 100. Contract cards have AM954, AJ107, 109 listed as lost at sea while AJ110 and 111 look like they share the fate of AJ109.
There is a question whether AM954 to AM963 possibly used the P&W R-1830-90 engine which helps explain them being redesignated mark III. USN order 68219 F4F-3 production ended in February 1941, with the R-1830-76, order 75736 F4F-3A production March to May 1941 with the R-1830-90, F4F-3 production from May 1941, the first 19 with R-1830-76, the remainder with the R-1830-86 (31 accepted to end June). Martlet II Order, 10 in March 1941 (became mark III), then June on, engine R-1830-S3C4G.
F4F-3A/Martlet III, Diversion from USN order 75736, requisition BSC.1465, P&W R-1830-90, AX724 to AX747, AX753 to AX754, AX761 and HK840 to HK842, total 30. Originally for Greece. AX725 to AX738 incorrectly listed as mark I in RAF Contract Card summary making the mark I order 95. AX741 to 747 and AX761 have RAF Serial Register entries. The import report has 27 Wildcat arriving in the Middle East in July 1941 and 3 more in October.
Martlet IV/Wildcat IV/F4F-4B, order LL-83734, requisition BSC.154 for 150, requisition BSC.7207 for 70, total 220. Wright R-1820-G205A furnished by Britain, given the bottleneck engine supply was at the time it suggests the engines were available from a British engine order, saving on R-1830, plus providing compatibility for the Martlet I. Serials FN100 to FN319 with FN205 to 207, FN240 and FN241 lost at sea.
Wildcat V/FM-1,from USN order 99036, requisition BSC N.4, P&W R-1830-86, the USN reports 311 accepted for RN as JV325 to JV636, which is 312 serials, BuNo. 15415/JV428 reported delivered to USN, then in 1943 to Britain. JV325 to 414 did not have USN BuNo.
Wildcat VI/FM-2 from USN order NOa(s)-227 (99036), requisition BSC N.4, Wright R-1820-56/72W in 1943, -72W in 1944, -56W in 1945, serials JV637 to JV924 and JW785 to 836, total 340. The USN reports 98+242 = 340 FM-2 accepted for RN, indicating serials JZ860 to 889 were not used. FM-2 acceptances for Britain ceased in May 1945, which is 3 months before FM-2 production ended.
USN orders,
Contract 46973, 2 March 1936 became 63072, 3 October 1938, for 1 XF4F-3 (ex XF4F-1 and XF4F-2) P&W XR-1830-76, BuNo 0383
Contract 68219, 8 August 1939, for 78 F4F-3, P&W R1830-76, plus 1 X4F-4 with the same engine, 2 XF4F-5 with Wright R-1820-40 and 1 XF4F-6 with a furnished by contractor P&W R-1830-90, BuNos 1844 to 1897, 2512 to 2538 and 7031.
Contract 75736, 5 August 1940, for 19 F4F-3 with P&W R-1830-76 (BuNos 3856 to 3874) and 88 with P&W R-1830-86 plus 95 F4F-3A with P&W R-1830-90 and 596 F4F-4 with P&W R-1830-86 and 21 F4F-7 with P&W R-1830-86, BuNos 3856 to 5283, 01991 to 02152 and 03385 to 03544.
Contract 99340, 16 May 1942, for 573 F4F-4 with P&W R-1830-86 plus 2 XF4F-8 with Wright R-1820-56 and 100 F4F-3 with P&W R-1830-86/76. BuNos 11655 to 12329
Contract 99036, 18 April 1942, for 1,150 FM-1 (311 for RN) with P&W R-1830-86, BuNos 14992 to 15951 and 46738 to 46837
Contract NOa(s)-227 (99036), 31 December 1943, for 4,100 FM-2 (340 for RN) plus another 1,423 in 1945 of which 746 were cancelled, with Wright R-1820-56/72W in 1943, -72W only in 1944, -56W in 1945, a total of 4,777 built. BuNos 15952 to 16791, 46838 to 47437, 55050 to 55649, 56684 to 57083, 73499 to 75158, 86297 to 86973 with 86974 to 87719 cancelled.
Contract NOas-1662, N.A.M. 1107 for 3 XF2M-1 dated 31 October 1944, cancelled.
Martlet I production July to October 1940, F4F-3 production 2 in August 1940, then November 1940 to February 1941, May to December 1941, February to March 1942, January to May 1943, F4F-3A production March to May 1941. F4F-4 production November 1941 to December 1942, F4F-7 production January, March, May to September, November and December 1942. FM-1 production September 1942 to December 1943. FM-2 production September 1943 to August 1945. Total production 7,905.
From USN Aircraft performance charts, propellers
F4F-3, F4F-7 Curtiss Elec. CS 3 Blade 9 ft 9 in, Blade Design No. 512
F4F-4, FM-1 Curtiss Elec. CS 3 Bl. 9 ft 9 in, Blade. Design No. 512-ICL-5-15
FM-2, Curtiss electric CS 3 blade 10 foot, blade design No. 109354-12
Admiralty Fleet Order 3186/1943
Martlet I and IV Aircraft Types of Engines Fitted. A.M.R. 2498/43. - 15 July 1943.
Some confusion may at present exist concerning the types of Cyclone engines which can be fitted in Martlet I and IV, due to the large variety of type numbers which may be found stamped on the engine date plates.
2 (a) Engines suitable for the Martlet I : Cyclone G.205A, Cyclone G.205A-2
2 (b) Engines suitable for the Martlet IV : Cyclone G.205A-3, Cyclone G.251A, Cyclone R.1820-40B
3 Apart from minor differences between the engines listed in 2(a) and 2 (b) above, such as ignition harness elbows, tachometer drives etc., the main difference is that 2(a) are fitted with 3 jaw starter shaft dog suitable for an electric-inertia starter, while 2(b) are fitted with a 12 jaw starter shaft dog suitable for a cartridge starter.
4. Engines shown within groups 2(a) and 2(b) respectively are interchangeable with other engines shown in the same group.
5. All engines shown in group 2(b) are fitted with an external oil scavenge line running from the oil pump at the rear of the engine to the sump at the front of the engine. Engines in group 2(a) were not originally fitted with this external scavenge line, but are being fitted on overhaul by the incorporation of Mod. Cyclone/45 so that this line alone may NOT be taken as a criterion by which to identify Martlet IV engines.