Yes the Spitfire was designed at the very beginning of the stressed skin construction becoming de rigeur, some years before the Lancaster. But, more significantly, it was expecting an order of just a few hundred and that spread over quite some time and from a small flying boat factory. It was cheaper and easier to rely upon the skill of the work force than invest in capital machinery and large new factory. Mass production in the overall company was the province of Vickers who owned Supermarine. We can see something similar at Rolls Royce who planned the Merlin production initially around a similar situation. The shadow factory system was rushed into place when it became clear that one would be looking at production in thousands but the design was already fixed. The Lancaster was designed to be built in thousands in new factories (or cleared out factories) and major sub contractors by largely semi skilled labour.
To ascribe a deficiency in production design between the Spitfire and Lancaster is, to some extent, comparing apples with oranges. Each of them was a conscious and reasoned decision awhich matched their different circumstances.
A comparison with the Hawker group is midway in the mid 1930s. They had the experience and production capacity to offer and supply larger numbers faster and had chosen a construction system which they had already used in quantity. It was not by accident that the RAF relied upon mass made Hurricanes rather than Spitfires in the BoB nor is it insignificant that the Hurricane was not only made by licencees in Yugoslavia and Belgium but that licences were purchased by other countries.It needed special tools to make the tube and joints but the work was better suited to less able labour. I have not found even estimate figures but the Vickers Venom structure looks far more production friendly than the Spitfire, coming from the mass production company of the Vickers group and in stressed skin construction rather than the company geodesic one.
Before one criticises the Spitfire production costs one has to see them with a 1935 eye not a 1941 one. The apparent artisan approach to the Spitfire these days translates into the increasing number of 'restored' Spitfires flying and on display today.
To ascribe a deficiency in production design between the Spitfire and Lancaster is, to some extent, comparing apples with oranges. Each of them was a conscious and reasoned decision awhich matched their different circumstances.
A comparison with the Hawker group is midway in the mid 1930s. They had the experience and production capacity to offer and supply larger numbers faster and had chosen a construction system which they had already used in quantity. It was not by accident that the RAF relied upon mass made Hurricanes rather than Spitfires in the BoB nor is it insignificant that the Hurricane was not only made by licencees in Yugoslavia and Belgium but that licences were purchased by other countries.It needed special tools to make the tube and joints but the work was better suited to less able labour. I have not found even estimate figures but the Vickers Venom structure looks far more production friendly than the Spitfire, coming from the mass production company of the Vickers group and in stressed skin construction rather than the company geodesic one.
Before one criticises the Spitfire production costs one has to see them with a 1935 eye not a 1941 one. The apparent artisan approach to the Spitfire these days translates into the increasing number of 'restored' Spitfires flying and on display today.