But they got well past the WNT/LNT limits with the Battles:
- 1942 ships: 2,315 tons standard / 3,290 tons full load
- 1943 ships: 2,480 tons standard / 3,430 tons full load
True that only Barfleur (commissioned 1944) saw action in WW2, but all 26 were laid down in 1942 or 1943.
The size of the Battle design from Spring 1941 was driven by war experience to date which indicated a requirement for a DP main armament with a minimum of 4 guns (for which the preference was that four should be carried forward of the bridge) plus 4 twin Bofors, two twin & 2 single 20mm, 2 quad TT and the standard 2 rails and 2 DC throwers. To get the best from the main armament the big Mk.VI HA/LA DCT was required. As the design developed and the two twin 4.5" forward turret set up settled on, a 4in "starshell" gun was added abaft the funnel so that the main armament need not be diverted to that task (this was replaced by more single Bofors in 1945 after the first 5 ships completed). The sketch design for the class was signed off in Oct 1941, before the war with Japan broke out, the reason often cited for their design.
Not everyone in the RN, or Govt, liked the greater size of the design though. Churchill for example in Aug 1942 wanted to cancel them and build more smaller ships that could be built quicker. The First Lord (the political head of the RN) wasn't happy with them either. Because of their size, relative to previous classes, they were given distinctive Battle names, a repeat of what had happened with the Tribals against the A-I classes. It had been planned to give the 1942 ships A & B names. They also caused issues amongst the smaller destroyer builders due to the extra 4 ft of beam rather than the length. As a result the RN had to adopt a "hi-low" mix in destroyer production until the end of WW2
1942 Programme
This saw 8 Battles ordered on 27 April 1942 following War Cabinet approval the previous week & another 8 in Aug. Laid down Oct 1942 - Nov 1943 and completed Sept 1944 - Dec 1946. Although Barfleur was commissioned in Sept 1944, she was without her Mk.VI director (development and manufacturing issues) and was laid up on a Care & Maintenance basis until it was available & fitted. Accordingly it was 24 Jan 1945 before she sailed for first of class trials out of Malta before moving on to Sydney where she arrived at the end of May. The next 4 ships also had their service entry delayed when 4 Mk.VI directors were used to refit the battleship Anson. On 15 Aug 1945 Barfleur was at sea off Japan with the BPF and the next 3 ships were in the Med working up. By Christmas 1945 there were 6 of the class in service with the 19th DF in the Pacific and another pair working up in Home or Med waters.
The other part of the 1942 "Hi-Low" mix were the Ch, Co & Cr flotillas (plus another 2 ships of the Ce group that were transferred to the 1943 Weapon order)
1943 Programme
There was an ongoing debate about the design of the 1943 ships, until eventually it was decided to work with a modifed version of the 1942 Battle. The 4in "starshell" gun abaft the funnel was replaced with a 55 degree 4.5in gun that served both as a "starshell" gun and provide some surface gunnery astern. The US Mk 37 director replaced the British Mk.VI. Quintuple TT replaced the quad sets. one twin Bofors was dropped (but 2 were of the much heavier self contained STAAG variety) and the DC armament was deleted in favour of a single Squid.
26 of these ships were ordered between March & June 1943, a number determined by the number of slips expected to be available. Two were later transferred to the 1944 Battle class (later renamed the Daring class). All remaining 24 were laid down Sept 1943 - June 1945. 17 were launched (4 after cancellation to clear the slips). But only 8 were completed Nov 1946 - May 1948.
The "Lo" part of the mix in the 1943 Programme emerged as the Weapon class. Design began in Spring 1942 with various options proposed (including several with a main armament of 40mm guns as a fast AS/AA carrier escort!). After much debate the design settled on was based on the smaller Emergency destroyer hull with an extra 2 ft of beam and unit machinery. Armament was to be 3 twin 4in, 2 twin Bofors & 4 twin 20mm, 2 quad TT, & 2 DC rails and 2 throwers with 50 DC (the DC arrangements were replaced in Jan 1946, before completion, with double Squid.
17 ships were ordered April / May 1943 plus the 2 Ce reordered from 1942 (see above). 3 ordered from Scotts at Greenock were cancelled in Dec 1944 as the yard was having trouble progressing existing cruiser, destroyer & submarine orders. 13 were laid down, 7 were launched (3 after cancellation to clear the slips) and just 4 were completed 1947/48.
1944 Programme
The fleet destroyer, the "Hi" element, was to be a modified Battle fitted with lightweight twin Mk.VI 4.5in turrets (which were at one point proposed for the last flotilla of 1943 Battles). A third turret was to be mounted aft and unit machinery adopted. Two sets quintuple TT to be fitted. The DC outfit was to be replaced with a single Squid. Initially 14 ships planned in Aug 1944 but in Nov it was decided to build 2 of the 1943 Battles to this new design, for a total of 16, with 8 cancelled at the end of the war. The remainder became the Daring class. Laid down Sept 1945 - Mar 1949. Completed Feb 1952 -Mar 1954. Designed at 2,610 tons standard displacement. They had topweight issues from completion.
The "Lo" part of the 1944 Programme was to be a single flotilla of G class destroyers which were ordered July / Aug 1944. Basically a Weapon with 2ft more beam and 2 twin 4.5in in place of the 4in main armament. These were weight critical from the earlist design stages and a variety of weight saving measures applied to the design did not help much. As a result the design was much criticised and quickly got the chop in the Dec 1945 round of cancellations.