drgondog
Major
It would have worked. Had NAA not been shut down by GMC when they requested R-R in late 1941, and had the AAF been disposed to allocating some of the 1650-1 production (HIGHLY unlikely in 1942) the P-51A could have been delivered with Merlin in Feb 1943 and operational in small numbers in Fall 1943.Or Wildcats / Martlets, or Avengers, or Corsairs or Hellcats (at least, on an early enough timeline so to speak)
I get that, I already conceded a couple of times to drop the proposal of the P-39X![]()
I kinda feel like I stepped in something when I made that comment and now it won't come off my shoe...
Yeah but how about a V-1650-1 (or theoretical V-1710 equivalent) into a P-51 / P-51A