The ventilation, explosion and evacuation issues would be considerable and challenging. The plan to move some oil production plant underground was called the "Geilenberg Plan"
From Wikipedia:
Edmund Geilenberg (born 13 January 1906,
Witten-Buchholz-Kaempen – died 19 October 1964,
Bassum[1]) was a German official of
World War II who headed an emergency 1944 decentralization program, the
Geilenbergstab or
Geilenbergprogramm (Geilenberg Special Staff), to disperse
Nazi Germany oil production.[
citation needed] The program included the Cuckoo project[
citation needed] for an underground oil plant to be "carved out of the
Himmelsburg" North of the
Mittelwerk,
[2] as well as plans for an oil facility at
Ebensee.
[3] "Geilenberg used as many as 350,000 men for the repair, rebuilding, and dispersal of the bombed plants and for new underground construction [which] were incomplete when the war ended".
[4]
Defenses included a 21 June 1944, order for a minimum number of
flak guns to be placed at Pölitz (200), Auschwitz (200), Hamburg (200), Brüx (170, Gelsenkirchen (140), Scholven (140), Wesseling (150), Heydebreck (130), Leuna (120), Blechhammer (100), Moosbierbaum (100), and Böhlen (70);
[1] and the Ruhland Fischer-Tropsch plant and other synthetic oil plants were upgraded to be "hydrogenation fortresses" (e.g., the plants in the Leipzig area were protected by over 1,000 guns). In addition to increased active defenses, the facilities (
German:
Hydrierfestungen) incorporated blast walls and concrete "dog houses" around vital machinery.
Similar to the technical experts transferred for the V-2 rocket program, 7,000 engineers were released from the German Army to provide technical support for oil facilities.
As you can see a lot of resources were tied up.
The plan was to decentralise and disperse most of the plants but only 1 may 2 Bergius plants would go underground . The Germans used two major processes:
1 Bergius high pressure hydrogenation.
2 Fischer-Tropsch catalysis.
Bergius hydrogenation involved pressurising an oil coal slurry at up to 700 atmospheres. (10,000psi). The special alloy developed to this was called bondur and resistant corrosion and embrittlement. (Useful for the order for 300 Uranium Centrifuges order pace an the Bamag firm at the end of the war)
The issue was that you need a Lurgi coal gasifier to make syngas which is then converted to hydrogen by pressure swing absorption. The Gasifier needs a liquid oxygen plant. The production of oxygen is associated with the production of nitrogen which can be used to make ammonia (using some of the hydrogen). The ammonia helps desulpherise the coal but is also an important co product in itself for explosives and fertiliser etc. The reactors and piping were so strong they were unaffected by direct bomb hits. However the hydrogen plant was very vulnerable. The plants continued to operate during allied bomb raids with the operators being given special pill boxes. When the plants were shutdown it was on the side that produced syngas. These plants produced 74 RON fuel out of the hydrogenation that could be upgraded with TEL to make 87 octane.
he Fischer Tropsch plants also needed gasifiers, syngas but it didn't need to be conditioned to hydrogen and after desulphurisation was reavted over catalysts to produce diesel or lubricants, the gasoline tended to be low grade, about 46 RON but I think with addition of TEL, some 30% methanol and a little upblending.
These fischer tropsch plants could be only 1/5th the size and dispersal could work with them.
There was a process that looked like fischer-tropsch but produced butanol which could be converted to butylene which could make both synthetic rubber and pure iso-octane. About 22% iso-otane was added to 87 octane fuel to make 97/130 fuel.
Improvements in gasifier and fischer tropsch such as fluidised bed reactors and new catalysts looked like increasing output and making higher octane fuel would have greatly improved the productivity of the system and reduced its costs. If the Germans had the technology they had in 1943 in 1937 their production would be higher due to improved efficiency.