1:32 Animated Model of the Battleship New Jersey Steering Gear Systems (2 Viewers)

Excellent work so far!
 
Thanks!
Hi there! Things are still moving along, albeit, slowly. The trip to Charleston was nice, but I came home with a cold that shut down activities for a week. I then spent a ton of hours refining and fixing all the frames. My first print was of a poorly designed/scaled frame and it was scrapped. I started printing frames in earnest this week. Of course, I reprinted an entire set not realizing that my numbering system created some confusion. Yesterday I got frames 190 and 191 finished. Frame 189.5 finished printing last night and is hanging on the machine. That means 3 down and 15 to go. It takes one to one and half loads per print to do the larger foreward frames. As they go aft they get smaller and I can fit more on the printer at one time. Regardless, each print roughly takes a day, so that's about two weeks of just printing frames. My scheme of splitting them to fit on the machine works nicely and epoxying them is a good solution.

SG Frame Glue Up.jpg


Even with going back and editing all the drawings, errors still remained and I had to some minor field mods to get things to fit just right. The longitudinals are designed to nestle exactly into the adjacent frame to feed the illusion that they're continous plate steel. Here are two places where some selective cuts need to be made. The first is where the longitudinals were a tad too high to get under the frame flange.

SG Frame Field Mods.jpg


The other was where I forgot to modify the frame bottom to accommodate the flat plate keel that's going on as a separate part. I'm going to rely on this keel to give structural integrity to the assembly.

SG Test Fit First Frames.jpg


In addition to taking a lot of time, the frames are consuming a ton of resin. I'm getting about three to four per kilo. That's $17.00 for 1 kilo bottles. And that's not accounting for bad prints of which I've had a few.

I've been spending a lot of thinking time on how to assemble this beast. I'm not too concerned if the frames' front edges don't align perfectly, but I am concerned to get their square back ends all straight and firmly attached to the back plate. As it stands now, the angular support structure is going to be 1/4" plexiglass with plexiglass brackets and base that's screwed to the wooden sub-base. I've been toying with the idea to make the back plate mirrored plexiglass so the frames will appear as they are all the way across the ship. The challenge with be what to glue them to the mirrored surface that won't make a mess. Even the transparent plexi will be a challenge to glue.

The other challenge is when to paint the frames. Ideally, they should be painted before assembling. That means gluing on painted surfaces which I don't think is structurally sound or scraping paint off of a myriad of contact points. Painting when assembled would be easier, but getting paint down into the intra-frame spaces would be difficult and waste a lot of paint. Frames are going to be painted Rust-oleum flat primer red which looks very much like the red lead paint used in the 1940s. Any suggestions? I don't think people will be able to see where the paint can't reach though.

That wasn't the only project I was working on while the printer was doing its thing. I had a strange leaking problem over the town on my massive O'scale model railroad. It was residue from a dishwasher leak that happened several years ago. I have Dupont Tyvek covering the basement ceiling to lighten the space, stop dust from falling (spiders too), and it provided a path for the leak that saved the town and my custom-built structures. The leak leached sap out of the floor joists and that sap had found its way through the sheeting. I got the plumber and we tore open the ceiling to see if any active leaking was still taking place. There was none, but the ceiling needed repair. I had lots of extra Tyvek.

Trouble on the P&PRR 1.jpg
Trouble on the P&PRR 3.jpg


I was afraid to do the repair myself being 81 years old. When I started this railroad project in Germany when I was on an expatriat assignment with Henkel, I was 54. I attempted to get help, but was striking out and my two grandsons who DID help build this were now 25 and 23 years old respectively and working as mechanical and systems engineers in Chicago. Bums! Left me high and dry.

However, the layout is 42" off the floor. The height enabled me to sit on the layout and reach up to the ceiling with a staple gun. But first all the buildings had to be removed and the remaining platform protected with ply. Where the trains run the layout could support 1,000 pounds, but the village has lighter construction and the ply helped distribute the load (my 182 pound load to be exact).

I was told by a great modeler years ago to "never glue your structures to the layout". You may need to move them, repair them or sell them, of which I've done all three. But first I had to go under the platform on my scooter—a four-castered flower pot stand I bought in Germany—and disconnect all the electrical wiring for the lights. That took at least 8 cycles of getting on the scooter and off.

The removed Buildings.jpg


With a utility knife I debrided all the damaged sheeting.

Debris Removed.jpg


I was able to handle the Tyvek sheet by myself and staple it up. It's not as pretty as the original work. I did that before there was a layout in the room and ran the sheets in continuous bands in the other direction.

Ceiling Fixed.jpg


The buildings still removed enables me to repair some things and fill an empty space where I previously sold a building (along with its base). I dreaded climbing on the layout with all the buildings in place to measure that hole to fill it properly, but with everything open that's no longer a challenge. I also cleaned and polished all the fire trucks and am replacing the gutters and downspouts on the firehouse to my upgraded standard. The fire trucks were "actually" weathered due to water that leaked and splashed on them. I also have "street repairs" where the water created a real pothole. Who would have thunk it??

Fire Truck Maintenance.jpg
Soldering Firehouse Downspout.jpg


I have several other building designs planned for the now-vacant improved lot in the town. They're all ornate victorian era structures which I'm getting good at creating.
 
Great work so far!
 
The longitudinal filler pieces worked as planned. Took a little bit of custom fitting, clamping and thin CA, and they are done. The remainder of the frames has the correct longitudinals integral with the Skeg.

IMG_9375.png
SG Gluing Skeg Filler.JPG


I test assembled the first three frames to see how the longitudinals plates align and they do. The entire frame will be quite large and complex appearing, which will add interest. These frames will be painted first and epoxied together.

SG Longitudinals Aligned.JPG
SG Test fit first 3.JPG
 
The molded numbers are for me to keep track of what frame goes where. I'm printing them out of sequence with some frames are intermingled. it was the best way I could come up with some order. When assembled, folks are going to have to look REAL hard to see them.

Firday's session was a mixed bag of progress and regression. Progress was getting more frames into the assembly stage and modifying the pasage for the prop shaft. I don't exactly know the prop shaft's diameter at the exit from the ship, but I know that it's 32" in diameter as it passes through all the intervening compartments. In 1:32, a 32" shaft is conveniently, exactly 1". So I bought a piece of 1" PVC pipe to serve the purpose. Like I did on the engine room's shafts, I had to print a plug for the end that will be visible. The shafts were basically solid steel with an 8" bore to "lighten" them a bit. I will install the plug on Monday.

As I wasn't sure what diameter I was going to make the prop shaft, I used the apparent diameters noted on the plans. They were ambiguous so I drew them with various diameters. Once I had the PVC in hand, I knew that I had to modify them to pass the shaft. I did this by tracing a chunk of the pipe and using the Dremel with a sanding drum. Not pretty, but effective. All of these passages will be obscured completely by the large prop shaft fairing casting that I will print. All you will see is the shaft exiting out the first frame that would be taking the shaft into the ship. Actually, I don't need a shaft at all, just the stub at the end. The prop will be supported by the outer shaft end that will be part of the end-of-skeg casting that I haven't drawn yet. That's the part that I'll probably sculpt out of clay and scan to make a printable part.

SG Prop Shaft Relief.JPG


Notice on the right hand skeg frame I broke off two of the longitudinal plates. I've perfected refitting those chunks since I seem to be prone to dropping/bumping them and breaking them off. Even with the 20% Siraya Tenacious resin to impart impact resistance, thin cross sections are still quite brittle and break with regularity.

SG Skeg Mods.JPG


Speaking of longitudinal breakage, here's two that I refitted. First step is to sand a chamfer to both mating edges. Then I apply Bondic UV resin and tack it in place. This is harder than it sounds since the contact area is minimal and it want's to move all over the place. After filling the chamfer area with Bondic, I am now brushing on some printer resin to further fill any voids and curing that with the UV LED puck included with the Bondic set. After this I put the whole thing in the UV cure chamber for a few minutes to further harden the weld. It's quite strong and the part appears as a whole without a breakage.

SG Fractures Repair.JPG


Then there's this! The print for nose and body of frame 194 failed in the most spectacular and troublesome way. I had this failure mode before and it's baffleing.

SG Complete Mess!.JPG


At first it appears to be a support failure, but upon closer analysis it's the raft delaminating. And it's hard to correct. You can see in this image that the primary raft layers are firmly attached to the build plate. So it's not adhesion that's the problem. The delamination occurred in the transition layers. The way this works is the first five layer (base layers) are exposed for 1 minute per layer to firmly cure these important layers for positive adhesion to the build plate. The next 15 or so layers start at the long exposure time and slowly, layer by layer, decrease the exposure until you reach the exposure for the rest of the print, in this case, 2.1 seconds per layer.

So something is happening among these layers. There a lot of arcane settings that control this. I had already gone through this before and thought I had it figured out. First I will evaluate how I had the job suspended on the plate and see how it compares to the other successful prints of parts very similar to these. Then I'll go from there.

SG Failure Bad News.JPG
 
Excellent work so far!
 

Users who are viewing this thread

Back