I don't think Einstein could either.
The lower Mezzanine Electrical Cabinets came out well and are ready for paint. That handwheel at the bottom is delicate. I printed three units (need two), but broke one of those details in clean up. I have two good ones left and need to be careful with them.
While I was very anxious to get the floors glued down, I realized there's one other detail that's quite obvious when visiting the real space; the two duck unders that permit crew passage athwartship under the two spinning propeller shafts. In addition to the step down into the hull, there are two three-step ladders on each side and a railing system that protects the space. The railing will be the last things I add to the floor.
The starboard side duck under isn't straight. it bends 90º that complicated the build a bit. Using the floor plan I located each prop shaft and note its location on the floor, then I used a square to layout the cuts. While the shafts are traversing the space on an angle, the duck unders are square to the ships bulkheads. There was no floor under them on my model. In the real ship, the 2nd skin buried in the triple bottom probably suffices as the floor. I had to build (old school) styrene assemblies to add floor and, eventually, walls on all sides. I first tried to just wall in the parts that didn't have lattice framing surrounding the opening, but found it wanting. This image shows that problem clearly.
The initial box was only partial.
I went back and retrofitted sides—all reinforced with 0.188" Evergreen Styrene Angle—to fully enclose the space. Lots of precision cuts, but fun.
This view before full enclosure shows how the two steps align.
After enclosure, the space is now shipshape.
The second, Port-side, space was simpler, being straight and only four-sided. Took half the time to build it out.
And from above;
It was warm, not windy so I was able to get the paint back one without delay.
Meanwhile, underneath I was doing some surgery. At first I tried to be cute and just nip away at parts of the lattice that interfered with the duck under boxes,
But after fussing with the fits, I just removed those lattice pieces completely. It was more trouble that it was worth to try and trim it close and it was all invisible. I sprayed the underside of the floor box areas to keep white styrene from showing when folks peered down the holes in the lattice.
Finally, I laid down the copper foil circuit tracks for the main steam pipe LEDs. The current load of these LEDs so minuscule that i have no doubt that cutiing the foil width in half shouldn't affect performance and it enabled me to run the entire curcuit on the bottom of the pipe out of view. I using three LEDs placed in strategic locations over the turbines. With all this light, I better do a good paint job.