Canberra B.6 engine runs

Ad: This forum contains affiliate links to products on Amazon and eBay. More information in Terms and rules

Avn-Tech

Airman
35
19
Dec 30, 2008
California City, CA
This week, we traveled north to begin assessing the Canberra for return to flying status. On the first day, we did a basic assessment of the airframe with only minor problems found. We then progressed to power on checks. After power on, checks we stopped for the day.

On day two, we inspected and cleaned the engines in the morning. In the afternoon, we attempted to start the engines. After several failed attempts, we were successful in starting both engines.

during our two days of maintenance, we run into several bumps in the road. But nothing we could not overcome and return her to flying status!

as our journey continues, I am sure we will find more bumps to challenge us as we work to return this aircraft to flying.


Please check out Canberra USA on Facebook for the videos.
 

Users who are viewing this thread

Back