P-322 AE978 to AE999, AF100 to AF220, total 143, with 12 officially accepted in November 1941, 1 in December and 10 in January 1942, the rest on 28 July 1942.
The Delivery Logs report November 1941, AE981 to 991, total 11, all on the first of the month., December 1941 AE993, total 1, January 1942, AE992, AE994, AE996, AF100, AF105, AF106, AF108, AF109, AF112, AF115, AF119, total 11.
Somewhere one of the November 1941/January 1942 acceptances had a date change. Most sent to NORISL. AF105, AF106 and AF108 to Britain arriving in March 1942. These 23 acceptances are called P-322, the rest P-322A, the engine type is given as V1710-F5L-F5R but only the above 23 have their engine serial numbers recorded, so AF982 as A-200952 (LH), A200953 (RH), AF983 has 54 and 55, AF984 has 56 and 58, AF985 57 and 61 and so on if anyone has an Allison engine serials list. Joe Baugher is probably correct the 23 had unhanded engines.
It is clear many of the P-322 airframes were built well before July 1942, most of the serials to AF123 have a January 1942 or earlier date somewhere on their Delivery Log entry, often ruled through. Air Arsenal North America states once the aircraft had been ordered without turbo superchargers they were locked into that decision in the 1941/42 timeframe.
The original French order was for 667 aircraft, the RAF allocated AE978 to AE999, AF100 to AF774, the remainder of the order became P-38F 43-2035 to 2184 and P-38G 43-2185 to 2558, they started production in early August 1942. The delivery logs have the P-38F under the French/British contract A-242, the P-38G under AC-21217.
The Vultee contract for P-38L, AC-760, is reported as signed on 26 June 1944. It was part of the I program, which was approved in June 1942, the order does not appear in the August 1943 RC-301 report but as of end December 1943 the letter of contract had been written and approved, for 2,000 P-38 type, but still officially uncontracted. By end April 1944 the order was on approved letter contracts, by end August it was an approved formal contract. First acceptances in January 1945. According to the RC-301 reports the order was cut to 173 in April 1945, then to 113 in May, production finishing in June.