Starting with the easiest question...I did. I specifically identified high-altitude, long-range PR.
If you want more specific details, let's say cruising altitude in excess of 30,000ft, max altitude in excess of 40,000ft, cruising speed in excess of 390mph, max speed in excess of 410mph at an altitude above 22,000ft, and capable of carrying cameras and lenses to image targets at NIIRS 6.5 or better from the defined operating altitudes over a range of, say, 1200 miles. Those figures are for early 1943. By mid-1944, improve top speed performance to 440mph, max altitude of about 48,000ft and range to 1500 miles.
Sorry to answer a question with a question but how are you measuring "equivalency"? If you're simply looking at production numbers, then that's not a good metric for a whole host of reasons: different population sizes between US and UK, different availability/costs of land for new factories, different priorities for land-use (UK turned every patch of unused dirt into a vegetable plot), different operational environments (I know I've brought this up before but distributed production imposes costs...the UK had to disperse production, the US didn't).
Spitfire production was geared to meet the needs of the front line. The only time it failed to meet those needs was when the main Supermarine factory was wiped out in 1940. Please show me where poor version/change controls resulted in front-line shortages of Spitfires?
Oh, and
Vickers Supermarine (to give the company its full title) also produced over 11,000 Wellington bombers.
Please show me where I said that version and change controls of UK based Spitfire production were superior? You made the claim that P-51 production was standardized whereas every component in the Spitfire changed. I'm simply refuting that assertion.
Look at the table
G
Geoffrey Sinclair kindly provided at Post #222. There was overlapping, simultaneous production of multiple Sptifire variants across different factories. Is there a significant loss of production when a new variant starts to be produced? I'm certainly not seeing it...and we have no way of knowing whether any production losses were due to retooling or to other external factors (e.g. follow-on contracts not being in place on time).
And if you can manage to do that, it's a great model. The UK couldn't for the reasons already explained (distributed production requirements). The RAF still had MUs that were capable of extensive modifications for one-off "specials" or to meet local needs (e.g. adding cameras to make local PR platforms - this was done, for example, on Hurricane and Buffalo airframes in Africa and the Far East respectively).
I may be drawing an incorrect inference from your "specials or non-standard" comment but it seems like you're suggesting that UK factories built one-offs that disrupted production. Are we back to elves hand-fettling Merlin engine components again? Spitfire production runs were standardized within the scope of the variant being produced across multiple factories. There were some false starts, like the MkIII, but every decision was made to maximize production to meet the needs of the front line...and, with the exception of Supermarine's factory being bombed in 1940, those front-line needs were met (including Reverse Lend Lease to the US and USSR).