Am I? NAA built 550 A-36, 310 P-51A, 2078 P-51B, 8300 P-51D from November 1942 through Aug 1945 plus 1400+ B-25G/H and a 'bunch of AT-6/SNJ' - haven't looked up either the B-25C or the AT-6 production at Inglewood.
Inglewood AT-6 Includes 36 Navy Trainers in 1940, most of "others" are earlier design trainers. Workers as of end December
| Model | Factory | 1940 | 1941 | 1942 | 1943 | 1944 | 1945 | Total |
| B-24 | Dallas | 0 | 0 | 0 | 61 | 905 | 0 | 966 |
| P-51 | Dallas | 0 | 0 | 0 | 177 | 2,540 | 1,835 | 4,552 |
| F-6 | Dallas | 0 | 0 | 0 | 0 | 74 | 225 | 299 |
| AT-6 | Dallas | 0 | 711 | 3,697 | 4,024 | 3,298 | 1,237 | 12,967 |
| Total | Dallas | 0 | 711 | 3,697 | 4,262 | 6,817 | 3,297 | 18,784 |
| B-25 | Inglewood | 0 | 171 | 1,119 | 1,253 | 665 | 0 | 3,208 |
| A-36 | Inglewood | 0 | 0 | 142 | 358 | 0 | 0 | 500 |
| P-51 | Inglewood | 0 | 138 | 634 | 1,533 | 4,368 | 3,276 | 9,949 |
| AT-6 | Inglewood | 631 | 1,524 | 8 | 0 | 0 | 0 | 2,163 |
| Others | Inglewood | 614 | 10 | 1 | 1 | 0 | 1 | 627 |
| Total | Inglewood | 1,245 | 1,843 | 1,904 | 3,145 | 5,033 | 3,277 | 16,447 |
| B-25 | Kansas City | 0 | 0 | 435 | 1,701 | 3,012 | 1,460 | 6,608 |
| Workers | Dallas | 185 | 7,386 | 20,345 | 35,910 | 18,473 | 1,089 | |
| Workers | Inglewood | 8,244 | 15,637 | 24,352 | 24,471 | 17,651 | 5,311 | |
| Workers | Kansas City | 0 | 1,186 | 12,960 | 21,924 | 16,794 | 0 | |
Workers at Supermarine and Castle Bromwich, 7-Mar-42 5,388 and 10,691, 5-Dec-42 6,436 and 10,062, 25-Dec-43 8,151 and 11,494, 23-Dec-44 9,148 and 13,670. Castle Bromwich produced 2 Lancasters in 1943, 162 in 1944 and 136 in 1945. Supermarine produced 42 Walrus in 1940, otherwise it was effectively all Spitfires and Seafires.
Overall the British seem to have concluded the US aircraft production system was more efficient. Add the comments about the Spitfire not being as well designed for mass production as the Mustang. Any comparisons have to assume consistent definitions and at least a similar amount of subcontracting. The USAAF had modification centres, the RAF did not. Looking at the early P-51B-5 they were emerging from modification centres about 2 months after acceptance, then reducing to 1 month. P-51C-1 about 1 month. Back to around 2 months for P-51C-10. All the P-51D have blank modification centre entries but generally entered pre modification a couple of days after acceptance.
That particular F-6D was a depot mod, probably UK - but I don't have my finger on the serial number yet. Most factory/US depot mods were P-51C-10 to F-6C and then F-6K and F-6D-NT from Dallas.
(44-14200)
The F-6A conversions were from P-51, F-6B conversions from P-51A, F-6C conversions from P-51B and C, by the looks of things all after entering USAAF service. This changed in August 1944, the conversions began to be done before delivery, the USAAF Delivery Logs report 146 P-51D accepted from Inglewood were delivered as F-6D, by block numbers 98 F-6D-10 and 48 F-6D-15, deliveries were 84 in August, 28 in September, 30 in October and 4 in November 1944. French means transferred to French Air Force.
53 Delivered as F-6D-10, 44-14196, 14200, 14233, 14306, 14318, 14323, 14335, 14340, 14352, 14357, 14369, 14375, 14386, 14392 (French), 14403, 14408, 14420, 14425, 14455, 14473, 14494 (French), 14508, 14512 (French), 14526, 14530, 14547, 14550, 14562, 14565, 14568, 14576, 14582, 14585, 14597, 14599, 14602, 14605 (French), 14608, 14615, 14617, 14619, 14621, 14623, 14635, 14637, 14639, 14641, 14643, everything to here delivered in Aug
15 Delivered as F-6D-10, 44-14655, 14657, 14659, 14661, 14663, 14675, 14677, 14679, 14681, 14683 (French), 14695 (French), 14697, 14699, 14701, 14703 (14679 in Sep, rest in Aug)
10 Delivered as F-6D-10, 44-14715, 14717 (French), 14719, 14721, 14723, 14735, 14737, 14739, 14741, 14743 (French) (14743 in Sep, rest in Aug)
10 Delivered as F-6D-10, 44-14755, 14757, 14759, 14761, 14763, 14775, 14777, 14779, 14795, 14797 (14761, 14777 in Sep, 14797 in Oct, rest in Aug)
10 Delivered as F-6D-10, 44-14817, 14821, 14832, 14833, 41834, 14837, 14839, 14841, 14845, 14847 (14833 in Aug, rest in Sep)
15 Delivered as F-6D-15, 44-14855, 14861, 14863, 14865, 14867, 14869, 14871, 14872, 14873, 14874, 14878, 14879, 14883, 14905, 149520 (Sep)
16 Delivered as F-6D-15, 44-15232, 15297, 15362, 15416, 15417, 15448, 15453, 15456, 15463, 15464, 15465, 15468, 15473, 15475, 15481, 15501 (Oct)
10 Delivered as F-6D-15, 44-15503, 15507, 15508, 15511, 15523, 15525, 15535, 15546, 15548, 15549 (15508, 15523 in Nov, rest in Oct)
7 Delivered as F-6D-15, 44-15554, 15565, 15566, 15572, 15581, 15582, 15583 (15572, 15581 in Nov, rest in Oct)
Note the production reports have an additional F-6D in September, serial so far not traced.
F-6 production switched to Dallas P-51K/F-6K in November 1944, using the same accepted as P-51K, delivered as F-6K convention. Around February/March 1945 the convention was changed, AND production figures for previous months adjusted so all F-6K were officially accepted as such, but NO changes to the Inglewood figures, only those for Dallas. So if you look at a January 1945 production report there is no such thing as an F-6K acceptance, but end March there are a total of 163 starting in November 1944.. F-6K production ended in March 1945 and F-6D production at Dallas began, all officially accepted as F-6D. Dallas, Remembering K-1 = D-5, through to K-15 = D-20, apart from the propeller.
57 F-6K-5 44-11554, 44-11897 to 44-11952
63 F-6K-10 44-11993 to 44-12008, 44-12216 to 44-12237, 44-12459 to 44-12471, 44-12523 to 44-12534
43 F-6K-15 44-12810 to 44-12852
November 1944, 56 F-6K accepted, 1 delivered, December 1944, 18 accepted, 71 delivered, January 1945, 35 accepted, 27 delivered, February 1945 17 accepted, 11 delivered, March 1945 37 accepted, 43 delivered. The 136 F-6D acceptances were 7 in March, 24 in April, 33 in May, 37 in June, 33 In July and 2 in August, the month P-51 production ended at Dallas.
31 F-6D-20, 44-13020 to 44-13039, 44-13131 to 44-13140, 44-13181
70 F-6D-25, 44-84509 to 44-84540, 44-84566, 44-84773 to 44-84788, 44-84835 to 44-84855
35 F-6D-30, 45-11655 to 45-11689
Effort in man hours, Spitfire production, mark / design / jigging and tooling, I think from the official history which gives numbers, instead of a graph.
I / 339,400 / 800,000
II / 9,267 / unknown
III / 91,120 / 75,000
V / 90,000 / 105,000
VI 14,340 / 50,000
IX 43,830 / 30,000
XII / 27,210 / 16,000
VII / 86,150 / 150,000
VIII / 24,970 / 250,000
XIV / 26,120 / 17,000
21 / 168,500 / unknown
PR XI / 12,415 / unknown
Seafire I / 10,130 / 18,000
Seafire II / 3,685 / 40,000
Seafire III / 8,938 / 9,000
Seafire XV / 9,150 / unknown
Spitfire on floats 22,260 / 35,000