I don't know '43 production. Allison shipped over 5000 with the auxiliary stage for the P-63. Assuming the P-63 cancellation in August '45 that would mean about 28 months of production or an average of 180/mo.
That big P-63 wing could have held a LOT more fuel than 132 gallons, but.....
 

Supposedly NAA took more time designing for the Merlin conversion than they spend on the whole P-51 airframe originally.[/QUOTE]
 
Last edited:

I'm a P-38 fan as well, my Dad was a combat Marine, 4th Marine Division, Roi-Namur, Saipan, Tinian, Iwo Jima. And he swore by the 38, and his dearly beloved Corsair. (Although that may have had as much to do with Marine pilots supporting Marines in ground attack). And with the "L" version, they did indeed add 12:1 aileron hydraulic boost. My book, like a kids baseball cards, has a page on each plane, and version, and at the bottom are three or four anecdotal remarks from pilots of the time. Up until the "L", they all shared the same comment "very poor roll rate". The "L" says " much improved roll rate". Still, I doubt that on that front it could never have competed with the P-51, with its clipped wings, and the advantage of engine torque to aid in rolls opposite prop rotation.
 

AHT says that 3303 P-63s were produced; ~110/mo.
Granted, it was a shame that P-63 didn't held at least 200-230 gals (1st deleting the possed guns and their ammo, so the ribs are designed to allow for another fuel tank on each side).
 
Well, if you kill WI you could replace water tank with another 50 gallons of fuel. But, emasculate the engine performance in the process. It was always a desirable fighter for VVS because they didn't care about range, and the P-63/39 was always undersized relative to range.

Tomo is correct that a LE tank could have been installed. That said, For comparison purposes, NAA told Material Command that sticking 16 gallon tanks in LE of P-51B would take a year to redesign the wing and insert into production release ----------------> begin delivery of 'modified P-51B/C with that design into D-Day. Unlike the Fuse tank, the LE tanks would not have been available as a kit - because the entire wing would have been altered with respect to airframe structural analysis.
 
Last edited:
That big P-63 wing could have held a LOT more fuel than 132 gallons, but.....
How and where?

The wing was already packed full of MGs, Ammunition wells, Maingear, Maingear well, Maingear articulation assembly, control surface actuators and corresposnding motors/linkages, not forgetting spars, formers and such. They even packed fuel cells inside of the inner wings at the attachment point.

 
The attachment is for a P-39. We're talking about a P-63 wing.
 


Bill,

If you have a moment to expand on the cause / nature of the NAA / Allison relationship that resulted in the above comments it would be appreciated. If it's in your book I can wait!

Cheers,
Biff
 
Resp:
There has been little published about these last P-38 variants, so many people aren't aware that Lockheed did get it fixed. I know of at least one FG that deployed (late '43?) to England that received no training on two engine planes, much less fighters. Their first indication was when the pilots walked out to the Tarmac and saw the parked P-38s. I did read where a Luftwaffe pilot witnessed some manuvers by P-38s late in the war, where he exclaimed: "They aren't supposed to be able to do that!" I think it pertinent to remember the part they did play in the ETO, as they held the line, until the Mustang arrived and the P-47's 'range' was maximized. They did continue to play a part in 'shuttle' escorts near the end of combat.
 
Bill,

If you have a moment to expand on the cause / nature of the NAA / Allison relationship that resulted in the above comments it would be appreciated. If it's in your book I can wait!

Cheers,
Biff
Biff - the dominant issue is a.) they were always late on deliveries, causing the NA-73X/Mustang I deliveries to RAF to slide, and b.) they made significant changes without alerting NAA, also causing re-work at NAA and see a.) above.

In fairness, Material Command were in Allison's shorts and caused many of the aforementioned changes
 
Lockheed did get it fixed, those L models would have handled about any escort role including 8thAF. But the models before the J-25 just had too many problems and the L didn't start production until after D-Day and by then the LW was done.
 
Plenty of room in that wing for a lot more fuel, especially without the wing guns.
Again, where?
There's already fuel cells installed in areas that won't affect the aircraft's performance (i.e.: roll rate, etc.) or compromise the wing's structural strength. There's really no room left. You can't just arbitrarily stuff a tank here and there without some sort of trade-off. Additional tanks means additional weight with the tank, interior baffles and self sealing compound. Then add the weight of the fuel itself and then pumps, plumbing and such.

And removing the guns? Then what does the pilot do, use the centerline cannon as it's sole armament?

Bell's engineers were pretty clever people, we can pretty much assume that they placed as much fuel capacity in the wings as was practical.
 
I think the P-40Q WAS an answer to MANY U.S. needs during WWII. It would have been a very welcome addition / replacement everywhere the P-40 was flying in wartime service, and we flew them from before the war started until after the war ended. Had it been possible to extend the range, it could have been useful in places other than where the P-40 was the mainstay.

I am not saying it would have replaced something and become a war winner. I am saying it was head and shoulders better than ANY standard P-40, and we flew those in every theater of war right up to and past the end of the war. So, Yes, the P-40Q would have very useful and welcome by any P-40 command.

Regarding Post #275, good synopsis. Had Allison been instructed to work on a 2-stage integral supercharger, then they would have done so or at least tried.

I have been part of Motorola in the past, we we were asked to so so many things in electronics by the government that caused issues with other things that it isn't even funny. It would not surprise me in the least to find out things were the same in WWII.
 
Last edited:


Greg,

The question is why didn't the Army go with the Q. Was it costs to manufacture, or not enough return on investment once done (lives saved for increased performance)? IMHO once the Merlin powered Mustang started flying in ETO then in Asia it would be tough to justify spending any additional money on an airplane that couldn't literally compete with one you already had in production (P38K comes to mind although not exactly in the same category). I really like the looks of the Q and would love to see them flying today, and it was an improvement in performance back in the day.

Cheers,
Biff
 