1:350 Trumpeter USS Essex

Ad: This forum contains affiliate links to products on Amazon and eBay. More information in Terms and rules

That's the other challenge I've found with ships - numerous mods over their career that need some research if accuracy is to be achieved. Good work.
 
Yup! It's a ton of work, but it's actually going pretty well (so far). One correction, yesterday's line drawing was of the Intrepid's modified flag bridge. The image below it is of the Essex. There are some minor differences. Since I'm doing an Essex, I'm relying on the photograph for most of the guidance.

Had a couple of hours today and got back into the island mods. I was at the LHS and got some more styrene needed for this model. I made the extended flag gallery which replaces the kit's gallery. I used an old ellipse template to give me the nicely shaped front edge. I used the precision sander to square the edge.

Essex_Flag_Platform_layout.jpg


I measured this part with the flag cabin in its final resting place to get the size and placement of the galleries and where the cabin will glue to the platform. The Sharpie line shows where the cabin ends.

Essex_Flag_Pilot_to_lower.jpg


I then stared at the photo and realized that the platform in front of the pilot house also had to be extended AND the director tub that used to be on the pilot house roof, is now relocated cantilevered over the front of the pilot house windows. I cut off the existing gallery and created a shaped piece that's butt-glued to the new pilot house edge. I used solvent cement and then reinforced with some CA.

Essex_Pilot_House_Platform_attach.jpg


It was time to glue the main pieces together. I added some connecting strips to reinforce the mating edges. The joint came out pretty good, but a little sunken on the starboard side.

Essex_Mods_Cleanup.jpg


Instead of slathering on a bunch of Tamiya filler, I added some sheet styrene to build up the sunken portion and then attacked it with flat-pointed riffle file. If you not familiar with these, it's a file with curved ends allowing you to file a specific place without filling what's in front or behind.

Tomorrow, I add the filler to bring those surfaces together. The port side joint was much better and a little filler with fix it all up.

I made a small rooflet for the pilot house to cover that large hole left over from moving the director tub. I'll trim the curved edges tomorrow.

Here's the structural work completed. The gallery rails will be 0.015" X .125 styrene strip which scales out to a little over 40" high which is just about right. It's thin enough so it will bend around all those contours. It will probably look better than the kit's molded rails.

Essex_Pilot_House_New_Roof.jpg


It's going to all look okay once it filled and primed. I removed the door on the flag cabin to facilitate sanding all those joints and will replace it with a PE piece before the railings go on. Incidentally, 1 scale inch in 1:350 scale is a tad less than 0.003" (a sheet of paper), so even .005" PE is over an inch and half thick in scale, which is heavy steel plate (armor).
 
They come in sets sold by MicroMark.

The day started with adding some filler at the various joints. After sanding it, I shot it with a bit of Tamiya gray primer to highlight any troubles and then sanding it again.

I then added the gallery edge solid rails. I used solvent cement first and then touched it up with CA to ensure that it wouldn't break away. It came out okay so I added some 0.020" X 0.020" square styrene to simulate the underneath supporting ribs. In the prototype picture it shows the ends of the ribs and they appear as squares (to me). I originally was cutting them to length and then gluing them in, but realized that I could cut them long and clip them off with the flush cut cutters.

Essex_Island_Mods_Bracing.jpg


And here's what it looks like finished and waiting for PE and Paint.

Essex_Island_Mods_Comp_2.jpg


I put this aside and then bit another bullet: building the brass main mast tripod/platform and radar supports.

I traced the kit's mast top and cut it out of fairly thin brass stock using a jeweler's saw with a very fine tooth blade. I hand filed the edges to even them out. I drilled the main mast hole 1/16" and then the smaller radar mast with a #56 drill. The kit's legs are almost exactly 1/16" and the top mast is about 0.045" so I'm using a piece of 3/64" brass rod. Both rods will match the kit's closely.

I then laid out the bottom ribbing to add substance to the assembly and, more importantly, provide a place where the back two angular posts are going to tie into the mast top. I cut the underpiece out of the same thinner stock, but thought it needed some more meat so I traced that piece and again using the jeweler's saw, cut this out. It's not pretty, but will be almost invisible since there's more PE trim/railings/support beams.

Essex_Mast_Top_Start.jpg


These two pieces were soldered together using the RSU using some silver bearing solder. I clipped a small piece and then flattened it with small hammer on a v-block. I used TIX flux and heated until it melted. I used the highest temp solder I have so this joint wouldn't re-melt when I solder more stuff on. I have three other heat range solders that I'll use ending with TIX to do any PE soldering on the assembly. It's sitting on a ceramic soldering pad from MicroMark. It's nice since it's very soft and you can use pushpins to hold parts in place while soldering.

Essex_Mast_Top_1.jpg


So here's where we are now. I have to locate and drill the angular holes for the angle poles, make a jig to hold all the legs at the proper attitude while gluing. The GMM instructios for the lattice PE that goes in the middle has 1:1 drawings of the triangles making up the two platforms. I will be able to make a pyramidal wood block that will hold the legs properly for good soldering.

There's a lip that goes around the after portion of the top that I make using the brass on the PE frets. It makes good stock for scratch-building small stuff out of brass.

Essex_Mast_Top_2.jpg


I can also make those little triangular gussets and solder them also... or not, or use CA. I have options. Thinking about building this stuff is worse than actually getting down and doing it.
 
Well... lots of work, but it's sure fun!

First up today was trying out the new pedestals that will support the ship when it's finished. I got these from TotalNavy.com which I found when I googled, "Model Ship Pedestals". They're turned brass and look good. For the Missouri's pedestal I bought a lamp finial at a lamp shop. It worked good except that it's an unusual thread and I had to get different hardware to hold it all together. This one's going to have big bolts going through. I'm going to reinforce the ship hull's bottom with some thicker plywood and epoxy the nuts in place to facilitate gettng it all together.

Essex_Pedestal_Trial.jpg


Then I got down to business of making and soldering the three legs of the tripod mast. Using the kit's tripod legs I cut pieces of solid 1/16" brass. The back legs are a slightly different length than the vertical middle leg. I needed to solder them at the proper angles. While there could be some minor adjustments, major shifts would break the solder joints.

To figure out how to do all this, I first glued the kit's styrene parts together and temporarily glued them to the ship with white glue so I could measure the geometry. I measured the spacing of the lets at the mast top and laid out my soldered piece to locate these holes. Although the legs go backwards at an angle I drilled the holes straight on the drill press since drilling angular holes is a pain. Instead, I shaped the ends of the 1/16" brass legs do they set at the proper angle.

I then soldered them with 60/40 rosin core solder which melted at a lower temp than the silver-bearing solder that I used yesterday to layer the mast top. After soldering the vertical, center leg, I used hemostats to act as heat sinks to prevent the previously soldered legs from unsoldering. Even with the RSU, when soldering to thick stuff, enough heat would soak to the others to remelt them.

Essex_Soldering_Tripod_Mast.jpg


After all three legs were in place I test fit the tower to the model and made minor adjustments to get the spacing dead on. One of the biggest tests of this geometry would be how well the PE lattice platform part would nestle into the tripod. So I decided it was time to dive into this very delicate PE work.

The lattice platforms consist of three parts: the outside frame which gets folded twice sicne the middle bend is actuall a flat spot with two folds, the bottom platform with back rail and the top platform with its back rail. I use a large "hold-and-fold" from the Small Tool Shop, an essential tool if you're seriously going to do any PE work.

I thought about soldering this, but frankly, it's too delicate to get any kind of soldering tool anywhere near this assembly so I used CA. At the Scale Reproductions Inc, on Tuesday, I asked Brian Bunger (one heckuva model builder in his own right) about how he handles PE so it doesn't stick to his tweezers more than the work. His secret... he uses thick CA since it cures much more slowly, allows more working time, has more innate tackiness, and won't glue to the tools as easily. I tried it, AND IT WORKS!.

Here's the lattice platform waiting for the next step. The platforms had to wedge into the "V" created by the outside lattice. So far, I'm very happy with GMM's PE. It's etched on 0.006" stock which is a bit thicker than AM-Works. And it's not breaking at the bend lines. That's critical to keeping one's modeling mental health.

Essex_Lattice_Platforms_Build.jpg


Then I had to fit this into the crotch of the tripod mast. It took a bit of fittings, adjusting the legs, more fitting until finally the legs contacted the lattice platforms evenly. I had to break on leg loose and resolder it to a slightly wider stance after I reached it elastic limit.

Essex_Lattice_Platform_trial.jpg


The wedge-shape reinforcing brackets that go under the mast top, were located on the standard set of GMM PE. I bought both sets: standard Essex and Special Essex. The lattice platforms were in the special set, but the top brackets were in the standard set. I glued them on, and then decided to ACTUALLY read the instructions. There was a tiny gap cut in the upper edge of the bracket which I wondered what it was for. It was to drop on top of the main yards stays which is all part of a single PE part. So I had to rip them off. Now Murphy's Law works in reverse sometimes. You can have a terrible time getting PE to stick when you want it to. And then you have a terrible time getting PE off when you've put it on incorrectly. In this case I darn near mangled one of the brackets trying to break it loose. I was able to reasonably re-shape it after removing it.

The yard arm is an annoying, very delicate PE assembly consisting of the center piece with all the details, and two very slim PE pieces that you apply to the front and back to triple-up the yard proper and make it stronger and look better. It was very had for me to get together neatly and it continued to break loose as I was handling it. I thought about soldering it, but decided to keep wrestling with the CA.

I filed some flats on the back tripod legs so there was more glue surface to install the yard. The very fine stay glues underneath the mast top.

Essex_Signal_Yard.jpg


I then went back and re-fit the brackets and CA'd them into place. They also wrap around the legs a bit which helped provide more gluing area.

Essex_Main_Mast.jpg


According to the photos, the ship's bell hangs underneath the upper lattice platfrom. The kit does not include the bell, but my old Missouri had two of them and I was able to scavenge one for this more. I filed the bell's top flat and CA'd it to the underside of the top platform.

Essex_Bell_Install_2.jpg


Tried on on one more time on the ship to admire it. Of course I almost had a catastrophe when I grabbed it improperly, bent the yard and separated those three parts on one end and had to sweat a bit as I got it to glue it together again. For the up-scale Missouri, I shaped my own main yard out of solid brass bar and may yet do the same here if it continues to be trouble.

Essex_Bell_Added_1.jpg


There's still more work to be done on this very complex assembly: I want to put some angle brackets underneath, it gets a thick edge for part of the perimeter and then railing. Lastly there's the radar mast that goes on in back. I may solder the railing and definately solder the radar mast in place (or epoxy...no CA). All of this stuff is what makes looking at these models some compelling. As Gary Kohs of Fine Art Models described, "A fine scale model's detail, keeps you looking deeper and deeper and still finding new things of interest." I want this model to do that.
 
looks fantastic and I'm watching with interest. I have a 1/400 scale Heller kit of CVL Arromanches which I want to attempt to convert to HMAS Melbourne. It will take major surgery to do it, so watching how you change superstructure detail is more than just of passing interest to me.

What Ive seen so far is excellent work
 
Well...with all those accolades, you may not want to read today's post. It wasn't pretty.

So...just in case any of my dear readers ever get the idea that I'm the "World's Greatest Modeler" or something silly like that, today will dispell that thought forever. That complex tripod mast that you all saw in yesterday's post is no more. Instead, I fought valiantly as I regressed through layers of work as things kept getting more and more desperate. We're not through yet, but it was not a very fun day. It was a tag-team wrestling match where the opponent had 3x more folks on his team than mine.

It all started when I wanted to add gussets under the mast top. These went on sort of okay. As I was manhandling the mast to put all these pieces in place, previously glued stuff started to unglue. I don't trust CA and this was a prime example. The front brackets were little brass triangles that I made and CA'd. The rear ones was some very small sytrene strip since working the brass at this size started getting ridiculous. You can see in this pic how awful the yardarm was looking.

Essex_Ill-fated_gussets.jpg


The yardarm was the first part to break loose. First the joint on one side broke followed by the other. I dissected it from the mast, cutting the stays that were still captivating it. I didn't like how it kept deforming more and more. I took a #11 blade and separated the three layers. I'm going to do what I did with the Missouri; make a solid brass yard out of small brass square stock tapered to shape on the belt sander.

Here's the "debris" of the yardarm. I'm sure that when I make the solid one, the rather wiggly piece with all the detail will work out okay. Luckily, the GMM PE seems to be pretty tough and none of the tiny weather stations and antenna posts have broken off...yet.

Essex_Deconstructed_Yardarm.jpg


I wanted to install a piece across the front as it is on the photo. This piece wasn't easy to install, and the CA wasn't working. Then the bigger brackets started letting go. During all of this, one of the leg's solder joint let go. Nuts! In the process of soldering that back in place, the CA in most of the brackets let go due to the heating. And to make matters worse, the delicate mast platforms broke loose. I got that out with doing more damage and will reinstall it after other things are done.

I decided that the flimsy PE brackets now had to go since they were a mess and made a set of some heavier gauge brass. You don't see these parts from their edge so thicker material would work. I traced the existing parts and made two new ones.

Essex_Remade_Support_Brackets.jpg


Instead of gluing these in, I soldered them using the TIX ultra low-temp solder. I had to re-solder that leg two more times until it was finally structurally sound. I also made a new front piece and soldered the new brackets to it which they overlapped.

Essex_New_Brackets_installed.jpg


The mast was now very solid and I wanted to add a band around the edge to thicken it a bit. This turned out to be almost an hour of utter frustration. It ended without completion. The problem appeared to be caused by several factors. First, I'm using the side pieces of PE frets as my brass stock. They typically use half-hard (or harder) brass for this since it has to maintain its shape in very fine cross-sections. As a result, the banding was very springy and didn't want to stay put. I thought about annealing it, but this requires heating it too red heat and letting it cool. This oxidizes the surface badly and would have to be abraded to give solderable brass and that would deform the heck out of it.

The other is how TIX solder seems to behave. If you get a good joint the first time, it seems okay. But if the joint breaks loose, re-soldering it seems to get worse and worse and it just doesn't want to make a strong joint. It was also a bear to hold in place while I was heating it. I tried pliers of all different shapes, but ended with the thing completely detached. I'm going to try again on Monday when my head clears and my nerves recover.

Essex_Completely_Frustrating_Banding.jpg


It was one step forward and three steps back all day. You get days like that. Like I've always said, I'm not patient, but I am persistant! I may put the railing on without that band around the edge. Again, I'm the only one who would notice. If any of you has any suggestions about this, please tell me! Also, I need information about how to form the PE framing for the back of the SK (Bedspring) radar. The illustration in the instructions is ambiguous to me. I have a set of WW2 Naval Radars from Tom's Model Works that I'm going to practice on.
 
It was one step forward and three steps back all day. You get days like that. Like I've always said, I'm not patient, but I am persistant!

I have been like myself on to many builds but now I find myself walking away.Ships are a breed amongst themselves in modeling soldering is something I have not played with the build looks good!New day tomorrow.
 
If you solder the main structural elements of the component, is it really necessary to solder the supporting parts as well? wouldn't CA suffice for those bits. CA fails only when it is placed under stress. If you can position your mast and then add the do dads with CA, my opinion is that it will be well strong enough...


I think also there is a problem with the surface area in contact with other parts, as the following grab is meant to show

.
USS Essex grab.jpg


I would make that supporting bracket as a single piece, wrapping it behind the column support so as to increase the surface area between the column and strengthener. If you can get enough surface area in contact with each other, you will make your structure sufficiently strong regardless of whether you glue or solder.

Don't make life more difficult than it needs to be I think
 
Last edited:
Thanks for all the support! I agree. If the main structure is strong I don't need to solder everything, but CA sucks! I think I'm going to use epoxy and/or J-B Weld for some of these non-soldered critical assemblies. I used J-B on a lot of the tiny mast parts on the Missouri and it worked great. Drawback is the 24 hour cure time. I have 5, 15, 30, and long-set epoxies so one of them should work. Guillermo Rojas Bazan, probably the world's greatest aircraft modelers in 1:16 scale using all metal, uses epoxy to hold everything together. He doesn't use CA. If you have seen his work, check it out here:

Rojas Bazan Home

I look at what he does and simply can't understand how he does it. I've communicated with him last week via eMail and we discussed his techniques. Even after communicating with him directly, I still can't understand how he does it. AND...he used no power tools at all. Not even a small lathe. He makes model radial cylinders by pressing the fins into a flat piece of thin aluminum and then rolling this up into a finned cylinder. Really! After you check out his work, comment back and let me know what you think.
 

Users who are viewing this thread

Back