thanks boyz.
step by step! I am doing things for him the morning shift in this company for me is very tiring electrically, I have to do a lot of things and all of them already, to which I have so much work that I can't get to. I just ended up very tired and I don't feel like starting to modify the plane as we have time ahead of us and the other projects are in phases that almost can't be done things followed by curing paints or varnishes because I'm resting and I have the project in more phase design and drawing of parts to be manufactured than in making them.