wuzak
Captain
I guess that would be the reason why not, not enough of the two stage Merlins to go around. That's to bad. Didn't the Typhoon have a different engine though? Oh well, regardless I guess there were higher priorities for the limited number of Merlins to be had.
Yes, the Typhoon and Tempest had the Sabre.
The point I was making is that any resources directed to improving the Hurricane or updating it to fit the 2 stage Merlin would detract from Typhoon and Tempest development.
It is a similar story for the Griffon. It was redesigned in 1939 specifically to be suitable to fit in the Spitfire. Supermarine produced a Griffon/Spitfire Proposal and Hawker did the Hurricane?Griffon proposal.
The Griffon was in even shorter supply, as they only made around 8,000 in total.