huge Tunnel project

Discussion in 'OFF-Topic / Misc.' started by pbfoot, Mar 18, 2007.

  1. pbfoot

    pbfoot Active Member

    Joined:
    Apr 14, 2005
    Messages:
    7,636
    Likes Received:
    4
    Trophy Points:
    38
    Location:
    niagara falls
    Huge Tunnel project "Big Becky" they are about 6 mos into a 2 year tunnel under the city of Niagara Falls to divert more water presently 60% is diverted from the Falls and will now be increased to 70% for Hydro Electric projects here. It is using a much larger version of the Chunnel machine .
    TheStar.com - News - Big dig Niagara
     

    Attached Files:

    • bb2.jpg
      bb2.jpg
      File size:
      304.3 KB
      Views:
      492
  2. k9kiwi

    k9kiwi Member

    Joined:
    Jul 2, 2006
    Messages:
    850
    Likes Received:
    3
    Trophy Points:
    18
    Occupation:
    Self Employed
    Location:
    Kiwi Land
  3. syscom3

    syscom3 Pacific Historian

    Joined:
    Jun 4, 2005
    Messages:
    12,631
    Likes Received:
    309
    Trophy Points:
    83
    Gender:
    Male
    Location:
    Orange County, CA
    Pbfoot, thats quite interesting.

    Is the water flow diversion that the story says, is frm the Canadian alotment of water or is it from the sum total from the whole river?
     
  4. pbfoot

    pbfoot Active Member

    Joined:
    Apr 14, 2005
    Messages:
    7,636
    Likes Received:
    4
    Trophy Points:
    38
    Location:
    niagara falls
    There is a binational commission that decided back in the 50s about how much water was requiered to maintain the Falls and divided the remainder between the US and Canada to use for Hydro Electric power. As it stands usually only 30% of the possible water goes over the falls it will soon be 25%. There are 4 tunnels 2 in the US and 2 in Canada already in use and one open canal . This will allow Canada to maximize its portion .They have been able for about 60yrs to control how much water is diverted. The red arrows pic shows the upper river and indicates where the intakes are and the control dam . The Golden Hawks pic shows the generating area where they achieve the maximun drop or most power the Robert Moses plant by Con ED is just out of sight the the Hawks nose
     

    Attached Files:

  5. Matt308

    Matt308 Glock Perfection
    Staff Member Moderator

    Joined:
    Apr 12, 2005
    Messages:
    20,140
    Likes Received:
    54
    Trophy Points:
    48
    Occupation:
    Engineer
    Location:
    Washington State
    If I'm not mistaken, that tunnel boring machine is made about a stones throw from my neighborhood in local Kent Washington.
     
Loading...

Share This Page