- Thread starter
- #101
fubar57
General
Slow progression. Added the rear bomb bay bulkhead and crawl tube. The tube needs to be glued to the front bulkhead first and then finagled into the rear before glue can be placed. Halves are just push fitted to keep all aligned
Just need to glue in the wing spars and the side domes on the fuselage and this beast can be glued together. Speaking of the domes, they are attached to the innards by upper and lower nubs, the gluing area on each is about 1²mm. Dry fitted, the dome pivots freely. It doesn't touch the sides at all except at the attachment points. Working on a solution but it will involve plastic strips