Greg Boeser
2nd Lieutenant
Yeah. We do sheet metal. .016 to .036. Residential and commercial duct, mostly. A little architectual stuff from time to time, but mostly just HVAC.Don't recall us doing coils.
But sheet and "plate" up to 15" (380mm)
BIG
We buy coils of steel, 5 - 10 thousand lbs. each. My Duct-O-Matic holds six coils. I select the width and guage, punch in the dimensions and catch the finished product at the end of the line.
500' of product takes about an hour and a half.
Last edited: