Looking good there Evan.
Vic, leave the GBs as they are I think - four months is long enough to get an average model done, and the paint curing is only in terms of a day or two here and there. We already see entries of two or more models by entrants, and a high proportion of unfinished models in each GB - models we, as judges, are watching during this time.
The trick is in the choice and preparation - if it's going to take a lot of time to complete a particular model, within the time allowed in a GB, then perhaps keep things manageable, and only enter that one model, rather than increasing work load, at the probable expense of time spent per entry, by entering more models.