i used some lead sheet offcuts from the extension we are building at home at the moment,weighed out an equal amount for both sides cut it into small strips and dropped it in,i could only just get 15g into each side and 1g into the nose cowling,i then used tremco tape to hold the lead into place,looking forward neviously to testing it in the morning