**** DONE: Bf109E-4 White 7 Oblt. Hans Ohly StaffelKapitan 1/JG53 BoB Group Build

Ad: This forum contains affiliate links to products on Amazon and eBay. More information in Terms and rules

Ok started simple to get the ball rolling, while working on the Phantom today(sanding)...prop assembly on the go while I had the sandpaper out!:D
 

Attachments

  • 1_Prop Assy_1484.JPG
    1_Prop Assy_1484.JPG
    25.4 KB · Views: 118
Looking at these I would say a piece of cake, comparing to the Airfix ones of course.:)
 
Wings together....and showing the rear sink marks...to be dealt with...
 

Attachments

  • 4_Wings assembled_1526.JPG
    4_Wings assembled_1526.JPG
    23.4 KB · Views: 117
  • 5_Wings assembled_1528.JPG
    5_Wings assembled_1528.JPG
    28.4 KB · Views: 125
But there is always a work we have to do if these cavities have to be removed.
 

Users who are viewing this thread

Back